1. Alignment
• Move PIs to 25/50/100
• logging road starts at most northern part of section. -50' normal + extra for guying at logging road okay to avoid guy stub. If cliff and forced close to logging road, use guy stubs. no extra offset ever at proposed highway. ie: highway 100' normal = 100' away with 50' guys, guys in proposed highway okay
• add spotting constraints: stay +-50' from all streams (redo the ones moved by pi sta changes)
2. make h5 and h6 structures, make sure structures libraries are pointed in m drive directory… ie batch modify
3. redo method 1/4 str la to be opposite before (as is left is right and right is left)
4. optimal spot: fix left versus right la is correct str, have span lengths longer than Shuyan’s design
5. figure out 2000’ water crossing setup
6. add adss
7. copy pls backup from m/pls to m/proj/